Crop Stage Estimator

Growing degree days since planting and rough dates for the next stages.

OMRI Listed Options
20+ Years Experience
USA Made

Enter your ZIP code, crop and planting date to estimate growing degree days since planting, the stage your corn, soybeans or wheat is likely at now, and rough dates for the next key stages. It uses Open-Meteo weather history and forecast. Stages are estimates, so scout your field to confirm.

TNT timing for this crop: Corn

  • In-furrow at planting: TNT HEF 2-0-0 or HEF 2-3-0, 2-4 qt/acre.
  • Foliar at V4-V6: HEF at the label foliar rate of 0.5-4 qt/acre in at least 10 gal water/acre.

On certified organic ground in the US, use TNT HEF 2-3-0 or Super Salmon+ (OMRI Listed for NOP). HEF 2-0-0 is OMRI Listed for Canadian organic (COR) only. Check any input with your certifier.

Check spray windows for your ZIP

Stages are rough estimates from heat units. Hybrid, variety, maturity group, day length and planting conditions all change them, so scout your field to confirm. A guide, not a guarantee; check the product label and local conditions.

Common questions

How are growing degree days calculated for corn?

Each day's high and low are averaged after capping the high at 86 F and raising any value under 50 F to 50 F, then 50 is subtracted. The tool adds those up from your planting date.

When should I apply TNT HEF foliar on corn?

TNT's timing for a foliar HEF pass on corn is V4-V6, at the label foliar rate of 0.5-4 quarts per acre in at least 10 gallons of water per acre. Use the estimate to plan, then scout to confirm the stage.

Why are soybean stages less exact?

Soybean flowering is driven by day length and maturity group as much as by heat, so after emergence the tool counts nodes by days (about one every five days) and does not put first flower before about June 21 for spring planting.

How does it handle winter wheat?

For wheat planted August through December, fall emergence and tillering are counted from planting, and spring stages from January 1 with base 32 F, held to typical calendar floors because wheat needs longer days to joint and head.

How are future dates projected?

Up to 16 days ahead the tool uses the forecast. Past that it uses last year's temperatures at your location for the same dates, so projected dates are only a rough guide.

Best Selling Products

Discover why farmers choose TNT HEF for their soil health programs.